May 15 Pay the GST April 20th, 2017

When the summer time heat hits Vancouver and the Lower Mainland, we get calls from homeowners wanting Novo Solar to install shade solutions such as retractable awnings and exterior sun shades. Waiting until it is hot out will mean that there could be a delay in installation.  At that point Novo Solar Solutions is very busy and it can take 3 or 4 weeks to manufacture and install the system.

In that time your home is uncomfortable or you are spending more on your BC Hydro bill than you need to on air conditioning.

The same is true for Solar Energy Systems. The best time to install a Solar Panels is in the spring months of March or April. Installing during this time period ensures that the system generates as much energy through the summer as possible. That way you will generate credit with BC Hydro’s net metering program and you can draw on those net metering credits during the 4 months of low production in the wintertime.

We Pay the GST Until May 15th

Since our busy season is approaching, we want to get more people to beat the rush and install our shading and solar solutions in the next 2 months. Quote this ad below and Novo Solar will pay the GST on any of our products. But act quickly as this offer is only available for a limited time.

    Check all that apply

Novo Solar Solutions Pays the GST on all Solar Installations and Shading Solutions